Project Number |
1100126-003
|
Number of Announcement Times |
1
|
Related Laws and Regulations |
Act for Promotion of Private Participation in Infrastructure Projects
|
Major Infrastructure Project |
Yes
|
Applicable to Treaty/Protocol |
Yes
|
Treaty/Protocol Name |
ANZTEC
|
Project Name |
The Build-operate-transfer project of renewing Cheng-Xi incineration plant in Tainan City
|
Authority in Charge |
Tainan City Government
|
Address of the Authority in Charge |
No. 6, Section 2, Yonghua Road, Anping District, Tainan City
|
Authorized/Entrusted |
Authorized
|
Entrusted Institution |
Tainan City Government Environmental Protection Bureau
|
The Address of Entrusted Institution |
No. 72, Lane 133, Section 2, Zhonghua East Road, East District, Tainan City
|
The Provision of Authorized Institution |
Act for Promotion of Private Participation in Infrastructure Projects,Article 5, Item 2
|
The Matters of Authorized Institution |
Authorize the following matters:pre-assessment ,Public Hearing, Feasibility Assessment, Preliminary Planning, Announcement of Invitation to Tender, Screening and Evaluation, Negotiation and Signing of Contract, Project Management and other related matters.
|
Sectors of Infrastructure Project |
Environmental Pollution Prevention Facilities-Facilities specified in the relevant environmental protection laws and regulations for the storage removal treatment or final disposal of waste
|
Models of Private Participation |
BOT:The private institution invests in the building and operation of the infrastructure project and upon expiration of the operation period transfers the ownership to the government.
|
Date of Public Hearing (In Accordance with Article 6-1 of the Act for Promotion of Private Participation in Infrastrucure Projects) |
2020/04/22
|
Date of Feasiblilty Assesment (In Accordance with Article 6-1 of the Act for Promotion of Private Participation in Infrastrucure Projects) |
2020/10/22
|
The character, basic requirements, concession period and scope of the infrastructure project |
This case belongs to environmental pollution prevention facility, under Subsection 2, Paragraph 1, Article 3 of Act for Promotion of Private Participation in Infrastructure Projects.The public construction project is a waste treatment facility in accordance with Article 4 of Enforcement Rules of Act for Promotion of Private Participation in Infrastructure Projects. This case is located at No. 1007, Chengxi Section of Annan District, and it’s the waste disposal land. The area of the renewing Cheng-Xi incineration plant is 30,013 square meters, the area of the compensation facilities is 16,791 square meters, and the area required for 69 kV switchyard is 100 square meters, 46,904 square meters in total. The land use period is 25 years.
|
The Concession Period |
25 Years 0 months
|
The Scope for the Ancillary Enterprises Allowed for Private Investment |
Yes
|
Description |
This case is located at No. 1007, Chengxi Section of Annan District, and it’s the waste disposal land. The area of the renewing Cheng-Xi incineration plant is 30,013 square meters, the area of the compensation facilities is 16,791 square meters, and the area required for 69 kV switchyard is 100 square meters, 46,904 square meters in total. The land use period is 25 years.
|
The ceiling amount of the total expenses for the zone/section expropriating |
|
The means, limit and adjustment mechanism of the subsidies for operating performance |
|
The Qualification Requirements for the Applicant |
The methods of tendering in the Project can be used either Single Tender or Cooperative Alliance (maximum of five). The tenderer can choose only one method in the Project, and must meet the requirements of basic qualifications, financial qualifications and technical capabilities. The tender's qualifications can be found in Chapter 4 of the application notes.
|
Evaluation Items and Criteria |
The review of this case is divided into two phases: (1) Qualification review and (2) Comprehensive review. The evaluation items in comprehensive review are as follows: 1. Applicant and private organization preparation plan, engineering technical performance and experiences (15 points), 2. Construction plan (25 points), 3. Operation plan (30 points), 4. Financial plan (20 points), 5. Innovation and sustainable development (5 points) and 6. Presentation and Q&A session (5 points), The Applicant shall read the Chapter 7 of this Tender Document in detail.
|
Items Awating Negotiation |
No
|
Others |
|
The Method and Place to Obtain Application Document |
Download electronic files online, URL:https://ppp.mof.gov.tw/WWW/inv_ann.aspx
|
Application Document Fee and the Method of Payment |
free
|
The Method and Place to Submit Application Document |
The application documents must be delivered or mailed to the Environmental Protection Bureau of Tainan City Government by hand or by post (70155, the total receipt on the 1st floor, No. 72, Lane 133, Section 2, Zhonghua East Road, East District, Tainan City) .The application deadline is on August 9, 110, before 5 p.m. Overdue will not be accepted.
|
Application Deposit |
50,000,000
|
Does the Announcement Document Make Public the List of the Selection Committee? |
Yes
|
Change the Procedure if Any Major Obligation or Right Listed in the Public Notice ? |
No
|
Change Procedure |
|