Go To Content

History of Announcement

Number of Announcement Times Announcement Type Posting Date Closing Date
1 Selection Results 2022/08/01
  Change or Supplemental Announcement(No.1) 2021/06/28 2021/08/31
  Invitation to Tender 2021/05/12 2021/08/09

Basic Information

Project Number 1100126-003
Number of Announcement Times 1
Related Laws and Regulations Act for Promotion of Private Participation in Infrastructure Projects
Major Infrastructure Project Yes
Applicable to Treaty/Protocol Yes
Treaty/Protocol Name ANZTEC
Project Name The Build-operate-transfer project of renewing Cheng-Xi incineration plant in Tainan City
Authority in Charge Tainan City Government
Address of the Authority in Charge No. 6, Section 2, Yonghua Road, Anping District, Tainan City
Authorized/Entrusted Authorized
Entrusted Institution Tainan City Government Environmental Protection Bureau
The Address of Entrusted Institution No. 72, Lane 133, Section 2, Zhonghua East Road, East District, Tainan City
The Provision of Authorized Institution Act for Promotion of Private Participation in Infrastructure Projects,Article 5, Item 2
The Matters of Authorized Institution Authorize the following matters:pre-assessment ,Public Hearing, Feasibility Assessment, Preliminary Planning, Announcement of Invitation to Tender, Screening and Evaluation, Negotiation and Signing of Contract, Project Management and other related matters.
Sectors of Infrastructure Project Environmental Pollution Prevention Facilities-Facilities specified in the relevant environmental protection laws and regulations for the storage
removal
treatment
or final disposal of waste
Models of Private Participation BOT:The private institution invests in the building and operation of the infrastructure project
and upon expiration of the operation period
transfers the ownership to the government.
Date of Public Hearing (In Accordance with Article 6-1 of the Act for Promotion of Private Participation in Infrastrucure Projects) 2020/04/22
Date of Feasiblilty Assesment (In Accordance with Article 6-1 of the Act for Promotion of Private Participation in Infrastrucure Projects) 2020/10/22
The character, basic requirements, concession period and scope of the infrastructure project This case belongs to environmental pollution prevention facility, under Subsection 2, Paragraph 1, Article 3 of Act for Promotion of Private Participation in Infrastructure Projects.The public construction project is a waste treatment facility in accordance with Article 4 of Enforcement Rules of Act for Promotion of Private Participation in Infrastructure Projects. This case is located at No. 1007, Chengxi Section of Annan District, and it’s the waste disposal land. The area of the renewing Cheng-Xi incineration plant is 30,013 square meters, the area of the compensation facilities is 16,791 square meters, and the area required for 69 kV switchyard is 100 square meters, 46,904 square meters in total. The land use period is 25 years.
The Concession Period 25 Years 0 months
The Scope for the Ancillary Enterprises Allowed for Private Investment Yes
Description This case is located at No. 1007, Chengxi Section of Annan District, and it’s the waste disposal land. The area of the renewing Cheng-Xi incineration plant is 30,013 square meters, the area of the compensation facilities is 16,791 square meters, and the area required for 69 kV switchyard is 100 square meters, 46,904 square meters in total. The land use period is 25 years.
The ceiling amount of the total expenses for the zone/section expropriating
The means, limit and adjustment mechanism of the subsidies for operating performance
The Qualification Requirements for the Applicant The methods of tendering in the Project can be used either Single Tender or Cooperative Alliance (maximum of five). The tenderer can choose only one method in the Project, and must meet the requirements of basic qualifications, financial qualifications and technical capabilities. The tender's qualifications can be found in Chapter 4 of the application notes.
Evaluation Items and Criteria The review of this case is divided into two phases: (1) Qualification review and (2) Comprehensive review. The evaluation items in comprehensive review are as follows: 1. Applicant and private organization preparation plan, engineering technical performance and experiences (15 points), 2. Construction plan (25 points), 3. Operation plan (30 points), 4. Financial plan (20 points), 5. Innovation and sustainable development (5 points) and 6. Presentation and Q&A session (5 points), The Applicant shall read the Chapter 7 of this Tender Document in detail.
Items Awating Negotiation No
Others
The Method and Place to Obtain Application Document Download electronic files online, URL:https://ppp.mof.gov.tw/WWW/inv_ann.aspx
Application Document Fee and the Method of Payment free
The Method and Place to Submit Application Document The application documents must be delivered or mailed to the Environmental Protection Bureau of Tainan City Government by hand or by post (70155, the total receipt on the 1st floor, No. 72, Lane 133, Section 2, Zhonghua East Road, East District, Tainan City) .The application deadline is on August 9, 110, before 5 p.m. Overdue will not be accepted.
Application Deposit 50,000,000
Does the Announcement Document Make Public the List of the Selection Committee? Yes
Change the Procedure if Any Major Obligation or Right Listed in the Public Notice ? No
Change Procedure

Attachments

Files

Contact Information

Name Hsieh Yu Lin
Department
Phone 06-2686751-385
Fax 06-2882102
Email donamihs@gmail.com
Go top